Bridge at Craig Ranch – Master-Planned Residential Community
Request
The customer desired an appealing bridge design that would not only satisfy the necessary FEMA waterway regulations, but also enhance the overall aesthetic of the development.
Solution
Speed Fab Crete crafted a sophisticated five-cell arch structure complete with spacious medians and expansive sidewalks on either side.
Results
The bridge was fabricated in 3 months, swiftly installed within 2 weeks, and featured walls adorned with natural stone and distinctive lighting elements.